This guide lists the Indore Metro Yellow Line stations as reported in public sources, with a focus on the stations on and near the Super Corridor, and notes on which stretch is operational today.
What's Operational Today
| Milestone | Detail |
|---|---|
| Phase 1 (31 May 2025) | 6 km, Devi Ahilya Bai Holkar Terminal Station to Veerangana Jhalkari Bai Station |
| Extension (Sept 2026) | About 17 km and 16 stations operational in total, per public reports |
| Remaining sections | Under construction; full alignment planned at about 33.5 km and 29 stations |
Station names and exact sequencing are based on publicly reported alignment details and may be refined as construction and final naming progress. Always check the latest official update before making a time-sensitive plan.
Get the Station Map
A visual map of reported stations against the Omaxe Super Corridor Indore location.
Key Stations on the Yellow Line
| Station | Area served | Relevance |
|---|---|---|
| Devi Ahilya Bai Holkar Terminal | Airport area | Phase 1 starting point, operational |
| Veerangana Jhalkari Bai Station | Corridor approach | Phase 1 end point, operational |
| Super Corridor 1 / Super Corridor 2 | Super Corridor | On-corridor stations serving residents directly |
| Vijay Nagar Square | Vijay Nagar | Indore's established commercial hub |
| Palasia Square / High Court | Central Indore | Commercial and administrative core |
| Indore Railway Station | Railway station area | Rail interchange |
| Rajwada | Old city | Heritage and market district |
| Airport (terminal area) | Airport | Closes the loop back towards the airport |
How to Use the Station List When Shortlisting a Plot
Ask which reported station is closest to a plot you are considering, and separately confirm whether that specific stretch is operational or still under construction — the two are easy to conflate. See our metro status guide for the current operational picture, and our connectivity hub for road-based alternatives in the interim.
Ask which station is nearest your shortlisted plot
Get a clear, current answer before you decide.
Super Corridor Metro Stations: FAQs
Quick answers on the station list and status.
Public reports on the Yellow Line's alignment name two stations on the corridor: Super Corridor 1 and Super Corridor 2.
About 16 stations across roughly 17 km, according to public reports, following the September 2026 extension beyond the original 6 km Phase 1 stretch opened on 31 May 2025.
A 6 km section from Devi Ahilya Bai Holkar Terminal Station to Veerangana Jhalkari Bai Station, opened on 31 May 2025.
Reported stations along the 29-station alignment include stops near Vijay Nagar Square, Palasia, the High Court, Indore Railway Station, Rajwada in the old city, and the airport, in addition to the two Super Corridor stations.
Related Guides
About Super Corridor Indore
The 12 km planned corridor: route, land use and landmarks.
Super Corridor Indore Property
Property types, rates and buyer profiles on the corridor.
Super Corridor to Vijay Nagar
Road and metro routes to Indore's commercial hub.
Future Development in Super Corridor Indore
Metro, roads and Simhastha 2028.